Prepared by Neshaminy Hardscape
Discipline Patios, Walls & Stonework
Locality Doylestown, PA

Patios, Walls & Stonework Doylestown, PA

Patios, walls and walkways in stonein Doylestown, PA

Paver patios, segmental walls and Pennsylvania bluestone work in Bucks County. Everything we build sits on a compacted 2A modified base cut below frost depth, because that is what decides whether it is still flat in five winters.

Extent

Where the crew goes

Based in Doylestown, PA

  • Doylestown
  • New Hope
  • Newtown
  • Chalfont
  • Warrington
  • Perkasie

Works

What this firm takes on

  1. 01

    Paver patios & walkways

    Excavated to subgrade, geotextile over the soil, 2A modified compacted in lifts, bedding sand screeded, then edge restraint and polymeric sand.

  2. 02

    Retaining walls

    Segmental block with geogrid where the height calls for it, clean stone backfill and a drain tile daylighted so water is not loading the wall.

  3. 03

    Bluestone patios & steps

    Full-range or select Pennsylvania bluestone, wet-laid on a concrete base or dry-laid on stone dust, with risers kept even across the flight.

  4. 04

    Fire pits, seat walls & pillars

    Built off their own footing, with veneer or full-thickness stone and a cap set on a full mortar bed rather than dabs.

  5. 05

    Drainage & grading

    Surface grading, French drains and downspout extensions run out to daylight, usually the real fix behind a wet basement or a heaving walk.

  6. 06

    Repairs & relays

    Lifting settled pavers, rebuilding the base where it washed out, re-setting loose bluestone treads and repointing joints.

Schedule

What is included

Every line below is drawn from the works listed on this page. Nothing is added that the business has not stated.

Schedule of works, itemised by reference
RefItemUnder
01.1 Geotextile Paver patios & walkways
01.2 2A modified base Paver patios & walkways
01.3 Polymeric sand Paver patios & walkways
02.1 Geogrid Retaining walls
02.2 Clean stone backfill Retaining walls
02.3 Drain tile Retaining walls
03.1 Wet-laid Bluestone patios & steps
03.2 Dry-laid Bluestone patios & steps
03.3 Even risers Bluestone patios & steps
04.1 Footings Fire pits, seat walls & pillars
04.2 Stone veneer Fire pits, seat walls & pillars
04.3 Cap setting Fire pits, seat walls & pillars
05.1 French drains Drainage & grading
05.2 Downspout runs Drainage & grading
05.3 Regrading Drainage & grading
06.1 Base rebuild Repairs & relays
06.2 Re-setting Repairs & relays
06.3 Repointing Repairs & relays

Sites

Ground already worked

  • 01

    900 sq ft paver patio with seat wall

    Buckingham

    Patio · Seat wall

  • 02

    Terraced segmental wall, two lifts

    New Hope

    Retaining wall · Geogrid

  • 03

    Bluestone front walk and steps

    Doylestown

    Bluestone · Steps

  • 04

    Driveway apron and pillar rebuild

    Newtown

    Pillars · Apron

  • 05

    Settled patio lifted and re-based

    Warrington

    Repair · Base rebuild

  • 06

    French drain and rear regrade

    Chalfont

    Drainage · Grading

Order of work

How a job runs

  1. Phase 01

    Site visit and layout

    We walk the grades, mark where water goes now, and lay the shape out with paint so you can stand on it before anything is dug.

  2. Phase 02

    Written proposal

    Material named by manufacturer and colour, base depth stated in inches, square footage measured rather than estimated.

  3. Phase 03

    Excavation and base

    Utilities marked through PA One Call, soil hauled off, geotextile down, then base placed and plate-compacted in lifts of a few inches.

  4. Phase 04

    Setting and finishing

    Pavers or stone set to the layout, cuts made on a wet saw, edge restraint spiked, joints swept, compacted and locked.

  5. Phase 05

    Clean-up and walk-through

    Beds restored, site swept, and a walk with you covering settling, efflorescence and when to seal if you want to.

Registration PA Home Improvement Contractor #NESHAM-DEMO-000 Stated by the business
Insurance General liability & workers comp Stated by the business

Notes

Asked before the first visit

How deep does the base need to be?

Six inches of compacted 2A modified under a patio, ten to twelve under anything a vehicle drives on. In Bucks County clay we often go deeper, and the proposal says which.

Pavers or bluestone?

Pavers are interlocking, forgiving of frost movement and easy to lift and re-set. Bluestone is irregular, looks right on older stone houses here, and costs more to cut and set. Both last if the base is right.

What is the white haze on my pavers?

Efflorescence — salts moving out of the concrete as it cures. It usually weathers off within a year. A cleaner made for it will take it off sooner; pressure washing will not.

Does a retaining wall need a permit?

In most of these townships, over four feet does, and over that height it needs an engineered design with geogrid. We file the drawings; you will see the engineer’s fee as its own line.

Can you work in winter?

Excavation and base work, yes, until the ground is frozen. We do not set polymeric sand or mortar below about fifty degrees, so those steps wait for a warm stretch.

Request a design visit

Tell us about the site.

Call (215) 555-0157
Open
Mon–Fri7:00 – 4:30
SatEstimates by appointment
Call Request a design visit
Concept by ORELVI · the business on this page is fictional